PROJECTS

THE MEADOWS

PHASE 4A SUBDIVISION 

  • 10,000m3 of topsoil stripping

  • 20,000m3 of site grading

  • Over 3km combined of sanitary, storm, and water main installation, some of which ranging over 6m in depth.

  • 75 lot services.

THE MEADOWS

PHASE 4B SUBDIVISION 

  • 5,000m3 of topsoil stripping

  • 15,000m3 of site grading

  • 2.5 km combined of sanitary, storm, and water main installation, some of which ranging over 6m in depth.

  • 69 lot services

THE MEADOWS

PHASE 5A SUBDIVISION 

  • 8000m3 of topsoil stripping

  • 17,000m3 of import site grading

  • 1.5km combined of sanitary, storm, and water main installation, some of which ranging over 6m in depth.

  • 65 lot services.

CILO APPARTMENT

BUILDING 

  • Completed all area grading around the proposed apartment building complete with detail backfill. 