PROJECTS

17938846108102102.jpg
17896890643332010.jpg
18060682765096220.jpg

THE MEADOWS

PHASE 4A SUBDIVISION 

  • 10,000m3 of topsoil stripping

  • 20,000m3 of site grading

  • Over 3km combined of sanitary, storm, and water main installation, some of which ranging over 6m in depth.

  • 75 lot services.

THE MEADOWS

PHASE 4B SUBDIVISION 

  • 5,000m3 of topsoil stripping

  • 15,000m3 of site grading

  • 2.5 km combined of sanitary, storm, and water main installation, some of which ranging over 6m in depth.

  • 69 lot services

THE MEADOWS

PHASE 5A SUBDIVISION 

  • 8000m3 of topsoil stripping

  • 17,000m3 of import site grading

  • 1.5km combined of sanitary, storm, and water main installation, some of which ranging over 6m in depth.

  • 65 lot services.

CILO APPARTMENT

BUILDING 

  • Completed all area grading around the proposed apartment building complete with detail backfill. 

Meadows Parkway​ Water and Sewer

  • Completed large diameter storm and water main installation along Meadows Parkway.

  • This job required us to safely cross a high pressure gas main at great depth. 

  • Our competent supervisors and workers safely and efficiently executed this work. 

Taylor Street Primary Water Main

  • 1050mm Valve Vault installation for the City of Saskatoon.

  • 1050mm Water Main Installation.

 

17956773091153421.jpg
IMG_20200529_101504-01.jpeg

Meadows Apartment Building 

  • 250 unit apartment building excavation

  • Grade Beam Excavation

  • Pile Cap Excavation

IMG_20200313_1048142.jpg
IMG_20200818_135539-01.jpeg

Rosewood Phase 5C

  • 100 Lot Subdivision excavation

  • 100,000m3 of excavation 